Dollar Store slide

Dollar Store Floor Void Filling

Covington, Virginia

dollar store featured

The Job

A commercial contractor was performing a full gut renovation of a dollar store in a strip center. The building was approximately 30 years ago, and there were no signs of floor slab failure or settlement.

The Challenge

While cutting through the floor to install utilities, a 3″ void was discovered below the floor. Exploratory coring determined that voids ranged from 0.5 to 4″ throughout approximately 11,000 square feet of the space.

The Solution

CJGeo mobilized two geotechnical polyurethane grouting crews to the site and filled the voids over a period of two days. Approximately 7,000 pounds of CJGrout 20SDB were placed through approximately 500, 5/8″ holes, with cross-hole communication cutoff criteria. The work was performed without disruption to the renovation activities.

Speak With An Expert

Facing a similar challenge? Give us a shout or shoot us a text.

Virginia to MaineEverywhere Else
Lauren LeVineMartha Moore
d: 804-471-3022d: 804-404-2683

Top