The Job
Dominion’s Bremo Bluff Power Station was taken off line in 2019. As part of complete decommissioning, demolition was performed in 2022.
The Challenge
Four, 48″ cooling water pipes needed to be filled with grout to ensure longterm stability of the surrounding area. In addition to the pipes, a junction box they all connected to needed to be filled.
The Solution
CJGeo generated and placed approximately 300CY of 50psi cellular concrete to fill the junction box and pipes. The material was generated onsite over the course of a few hours using dry batch generation.