NJ Turnpike Slide

Garden State Parkway grouting

Middletown, New Jersey

NJ Turnpike Featured

The Job

As part of ongoing large diameter culvert rehabilitations and replacements, four new bored stormwater crossings and the original culvert they replaced needed to be grouted. The tunnels ranged from 120″ down to 74″, for a total of 312CY, and the abandonment required 405CY.

The Challenge

Grout needed to meet the minimum strength requirements of the owner, and ideally needed to be light enough to facilitate single lift annular space grouting.

The Solution

CJGeo’s preconstruction team worked with the general contractor to design a grouting program which facilitated single lift abandonment of the original culvert, and single lift grouting of the four various annular space runs. CJGeo utilized onsite dry batching to generate 30lb/cuft CJFill cellular concrete.

Speak With An Expert

Facing a similar challenge? Give us a shout or shoot us a text.

Virginia to MaineNorth Carolina to FloridaEverywhere Else
James CorbinAndrew TaliaferroMartha Moore
d: 804-442-7371d: 804-471-3061d: 804-404-2683
Top