The Job
This Iowa thermal grouting project by CJGeo is located in Creston. As part of a grid-scale battery storage installation, contractors had to bore transmission lines under multiple BNSF railroad tracks, also used by Amtrak. For ampacity management, the trenchless crossing required thermal grout in the bore annulus.

The thermal grouting operation and placement pit.
The Challenge
This jack and bore crossing has two parallel bores, each 150 feet long and 24 inches in diameter. The locally-available aggregate in the ready mix market was not suitable for achieving the specified thermal resistivity requirement.
The Solution

Placing the thermal grout.
CJGeo performed the thermal grouting using CJTherm TM-5 thermal grout mix. Since locally available material wasn't available, we utilized material manufactured offsite and shipped in. This approach removed all risk and cost of developing a project-specific mix for a low volume placement.
Pressure and temperature were monitored continuously using cellular-enabled data loggers, and fed to the cloud. CJGeo's in-house materials team monitored heat and temperature live during grouting, and for 24 hours after peak heat. Peak heat of hydration was less than 95°F.
Speak With An Expert
Facing a challenge similar to this Iowa thermal grouting project by CJGeo?









