Mass & Load Reducing Fills

CJGeo’s advanced lightweight fills replace heavy aggregates to protect sensitive infrastructure, accelerating schedules and eliminating deep foundations and long surcharge periods. CJFill® low-density cellular concrete, ranging from 25–80 PCF, is manufactured and installed on-site to reduce axial and lateral loads for construction over weak soils, marine fills, and subgrade abandonments. For ultra-lightweight requirements, CJGrout® geotechnical polyurethane, as light as 2 PCF, delivers EPS-like density in a seamlessly injected, form-fitting polymer.

Related Services

Axial Load Reduction

Minimizes dead load overburden adjacent to retaining structures, over compressible soils, and above below-grade infrastructure. Learn More >

Lateral Load Reduction

Utilizes specially formulated cellular concrete mix designs that achieve densities slightly greater than water to facilitate underwater placement. Learn More >

Marine Fills

Utilizes specially formulated cellular concrete mix designs that achieve densities slightly greater than water to facilitate underwater placement. Learn More >

Underground Structure & Mine Fills

Reliably fills and stabilizes underground tanks, crawlspaces, basements, and mines to prevent settlement and groundwater infiltration. Learn More >

Void Filling

Both low-density cellular concrete and geotechnical polyurethane grouts effectively fill large voids and stabilize structures with minimal footprint or downtime. Learn More >

Related Materials

CJFill Cellular Concrete

Tailored to meet engineering specifications, CJGeo’s CJFill low-density cellular concrete mix designs range from CJFill Ultra-Lightweight, CJFill Higher-Strength, CJFill-Sanded, and CJFill-Underwater formulations. Learn More

CJGrout Logo

Generation Methods

Matching the exact generation method to individual project volume ensures optimal efficiency. CJGeo manufactures and installs CJFill low-density cellular grout in two ways.

CJGeo Crew using Dry Batch cellular concrete generation

Dry Batch | Higher Volume or Deep Lifts

Computerized on-site plants utilize high-energy colloidal mixers to combine dry materials and water, creating a structural matrix that protects entrained bubbles for lifts up to 10 feet. Three highly mobile tandem-chassis plants maximize efficiency, reliably placing up to 200+ cubic yards per hour. Learn More about Dry Batch cellular concrete generation.

CJGeo Crew using Wet Batch cellular concrete generation

Wet Batch | Lower Volume or Tight Access

Utilizing traditional ready-mix trucks to deliver cement slurry, foam is injected directly on-site. CJGeo’s three dedicated wet batch systems generate up to 70 cubic yards per hour, ensuring an economical, highly efficient solution for smaller placements and confined job sites. Learn more about Wet Batch / Truck Batch cellular concrete generation.

CJGrout Polyurethane Grouts

CJGrout polyurethane grouts have unique properties developed to solve targeted geotechnical and structural problems. From void filling beneath existing structures to spray-applied lightweight fill applications, there’s a CJGrout for that. Learn More

CJGrout Logo

Installation Process

Equipment

The entire polyurethane grouting operation runs from a self-contained box truck. Inside, a generator and heaters prepare the unmixed liquids at a 1:1 ratio before pumping them through heated hoses. Self-contained units house primary and secondary formulations, enabling low- and high-mobility grouting on the same project.

Grout Installation

A specialized pump mixes the two liquid components at a precise 1:1 ratio at the nozzle,  initiating an immediate chemical reaction upon application. This high-speed impingement system allows for stable, continuous build-up on horizontal, near-vertical, or overhead surfaces. Reaching 95% cure in just 15 minutes, these high-reactivity structural foams are perfect for tunnel annulus bulkhead sprays, overbreak fills, and similar applications.

Been There. Grouted That.®

PNG Line 2 Decomissioning

Logan Airport Lightweight Fill

At Logan Airport, a gap between curved barrier walls on an existing podium required ultra-lightweight fill. CJGeo crews pumped 64 cubic yards of low-density CJGrout 20SDB to seamlessly fill the irregular space in one shift, allowing the contractor to pour the topping slab the very next day. Read More >

PNG Line 2 Decomissioning

Route 58 Flyover Ramp Lightweight Fill

Panel 19 of the National Mall in Washington, DC, is a high-traffic, 16,000-square-foot lawn area situated directly above a WMATA metro tunnel. For over a decade, this specific section of the Mall was plagued by chronic sinkhole formation, creating significant safety hazards and maintenance challenges. Read More >

PNG Line 2 Decomissioning

D.C. Parking Deck Lateral Load Reduction

To backfill a new D.C. parking deck engineered with zero tolerance for lateral earth pressure, CJGeo placed 25 lb/cuft CJFill-Ultra Lightweight cellular concrete. This self-supporting, load-reducing fill safely brought the excavated area to grade without compromising structural integrity. Read More >

Beyond Traditional Lightweight Fill

Load Reduction

Cellular concrete has adjustable densities ranging from 25PCF-80PCF, while polyurethane grouts are as light as 2PCF. Both materials substantially reduce loads on sensitive structures and weak subgrades, can fit any shape, and often enable the construction of net-zero-load designs.

Reduced Costs

Utilizing lightweight fills accelerates construction schedules while value-engineering structural designs. Lowering loads often reduces or eliminates the need for expensive deep foundation systems, complex retaining walls, and soil improvement techniques.

Increase Speed

Polyurethane and low-density cellular concrete are both self-consolidating, removing the need for compaction. With mobile batch plants producing up to 200+ cy/hour, placement is much faster, and lifts can be much higher.

Speak With An Expert

Facing a challenge?