New Jersey Chemical Grouting

Project Number: 4549

The Job

This New Jersey chemical grouting project by CJGeo is located in Elizabeth.  Hurricane Sandy caused extensive damage to the JMEUC's Wastewater Treatment Plant.  As part of extensive upgrades and flood protection, contractors are installing a new flood wall around the perimeter of the site.  As an active site, there are extensive utilities crossing the flood wall alignment.  At each utility, there is a gap in the sheet pile which has to be closed using chemical grouting.

A deep excavation with sheet pile SOE.

Performing secondary grouting with acrylic grout.

The Challenge

CJGeo has performed extensive water control grouting on this site.  Previous work focused on stopping tidal flows through the stone bedding of the 26' wide effluent box culvert.  This phase of the project involved multiple crossings, ranging from 36" pipes to a double barrel box culvert.  The purpose of the chemical grouting is to bind bedding stone and soils below the pipes and structures together, making them impermeable.

The Solution

chemical grout returning to the surface during injection around a box culvert in an excavated pit

Grout return during primary grouting.

CJGeo designed a grouting program specific to each of the individual gaps.  For most, the primary grout is an expansive polyurethane grout.  The secondary grout is an acrylic grout.  The purpose of using two different grouts is to fill any bulk voids with polyurethane, which it is well suited for.  This helps to ensure that the acrylic grout doesn't fracture into voids instead of seeping through the relatively dense, fine grain target soils.

Over a few mobilizations, CJGeo worked in very tight quarters between the existing structures and the new sheet piles to successfully perform the grouting.

Speak With An Expert

Facing a challenge similar to this New Jersey chemical grouting job?

Connect

  • Contact Form
  • Call Us
  • LinkedIn

Explore Solutions

  • U
    Chemical Grouting

      Explore Services

      • U
        Leak Stopping
      • U
        SOE Gap Closure