Maryland Low Density Cellular Concrete

Project Number: 490

The Job

This Maryland low density cellular concrete project is located in Aberdeen, north of Baltimore.  Contractors were rehabilitating an abandoned water treatment plant at a federal facility to bring it back into service. As part of the project, lightweight flowable fill was needed to fill a 12′ deep tank below the building floor needed to be filled before installing a new floor and equipment.

lightweight flowable fill installation to fill a pit at a water treatment plant

Pouring the final lift of CJFill-UW cellular concrete.

The Challenge

The majority of the pit is below ground water level. The original foundation design used a 62PCF fill density for the pits, presuming they would only ever hold water.

The backfill material also needed to completely encase a number of new micropiles installed for machine bases.

The designer had two competing interests–given the closeness of the water table to finish floor, avoid any buoyancy of the fill material, while using the lightest possible material to avoid inducing any settlement.

The Solution

Pit fill with lightweight flowable fill

After the first lift was placed.

CJGeo proposed filling the pit with CJFill-UW, at 70lbs/cuft. At 70lb/cuft, there are no uplift concerns, and the material is just barely denser than water, which helps minimize the amount of anticipated settlement. To help ensure future excavatability, CJGeo used a sanded base slurry (as opposed to the usual neat mix slurry) to generate 830CY of lightweight flowable fill material. The 28 day design strength was 150psi. The average 28 day tested compressive strength was 200psi. The removability modulus of the material is 0.75, which means the material is readily excavatable.

Traditional “lightweight” flowable fill is closer to 95lb/cuft. At 150psi, 95lb/cuft material has a removability modulus of 1.18. This is above ACI’s benchmark value of 1 for ease of excavatability.

Batch generation in ready mix trucks was the best method for generating this CJFill-UW. Foam’s sprayed into the drum upon arrival at the site, then the drum blends the slurry & foam as it rotates. The blended CJFill-UW discharges via the chute directly into the placement area. Aerix Industries supplied the preformed foam.

Speak With An Expert

Facing a similar challenge to this Maryland low density cellular concrete project by CJGeo?

Connect

  • Contact Form
  • Call Us
  • LinkedIn

Explore Solutions

  • U
    Cellular Grouting
  • U
    Lightweight Fill

      Explore Services

      • U
        Axial Load Reduction
      • U
        Mine & Underground Structure Fills