Virginia Services

Millions of pounds and counting.

Based in Virginia, we do all kinds of things here and are around to help out. Having worked with lots of clients like.. X, Y, and Z. 

How We Can Help

Tyler Kaplan

Tyler Kaplan

Territory Manager: Geotechnical & Structural Grouting, Stormwater Utility Grouing

Here’s a little bit of information about Tyler. Have questions about Geotechnial & Structural Grouting or Stormwater Utility Grouting? That includes services like Void Filling, Undersealing, Seepage Control, Crack INjection, etc… Tyler has you covered!

Call: 123-456-7890
Email: tyler@cjgeo.com

Undersealing

Polyurethane can be used to seal under concrete and stop water from coming through. Learn More>

Void Filling

A quick sentence about the topic above giving a high level overview. Learn More>

Annular Space Grouting

A quick sentence about the topic above giving a high level overview. Learn More>

Undersealing

Polyurethane can be used to seal under concrete and stop water from coming through. Learn More>

Void Filling

A quick sentence about the topic above giving a high level overview. Learn More>

Annular Space Grouting

A quick sentence about the topic above giving a high level overview. Learn More>

James Corbin

James Corbin

Territory Manager, Utility Grouting

Here’s a little bit of information about James. Have questions about Utility Grouting? That includes services like Annular Space Grouting, Pipe Abandonment, etc… James has you covered!

Call: 123-456-7890,
Email: james@cjgeo.com

Undersealing

Polyurethane can be used to seal under concrete and stop water from coming through. Learn More>

Void Filling

A quick sentence about the topic above giving a high level overview. Learn More>

Annular Space Grouting

A quick sentence about the topic above giving a high level overview. Learn More>

Undersealing

Polyurethane can be used to seal under concrete and stop water from coming through. Learn More>

Void Filling

A quick sentence about the topic above giving a high level overview. Learn More>

Annular Space Grouting

A quick sentence about the topic above giving a high level overview. Learn More>

Been There Grouted That

A western mountain slope with heavy construction grouting equipment at a landing pad.

Utah Cellular Concrete

The Job This Utah cellular concrete project by CJGeo is located in Provo.  The tunnel is part of the Alpine Aqueduct Reach 1 project.  This project realigns an 84″ raw water pipeline away from a fault and landslide.  This helps ensure long term stability of the line…

read more…
CJGeo batch plant, water truck, frac tank and two cement tankers onsite at a construction site in a field

South Carolina Annular Space Grouting

The Job This South Carolina pipe abandonment work by CJGeo is in Greenville.  Three jack & bore crossings were used as part of the Adkins potable water transmission main installation.  The project, GC’d by Garney Construction, is 60″ welded steel pipe.  Each…

read more…
CJGeo batch plant, water truck, frac tank and two cement tankers onsite at a construction site in a field

South Carolina Pipe Abandonment

The Job This South Carolina pipe abandonment work by CJGeo was part of Columbia’s Lower Kinley Creek project.  After installation of a new sewer line, the contractor had to fill 8,350 linear feet of 30″ sewer main.  Without waste, this is 1,185 cubic yards of flowable…

read more…
a semi, cement pig, batch plant and pickup truck on a roadside pipe abandonment jobsite

Georgia Pipe Abandonment

The Job This Georgia pipe abandonment project by CJGeo is located on Old Alabama Rd, in Roswell.  It involved installing a new water main that was routed away from GA-19 into a more accessible location.  After the new pipe was installed, 5280LF of 48″ water main…

read more…
sheet pile tunnel shaft with a microtunnel and multiple carrier pipes

Massachusetts Cellular Grouting

The Job This Massachusetts cellular grouting project is located in Cambridge.  It is part of a new commercial construction project.  SECA Underground microtunneled under the MBTA Red Line tunnel with a 200 foot long, 63″ diameter steel casing.  Once the casing was in…

read more…
PNG Line 2 Decomissioning

PNG Line 2 Decommissioning

The Job As part of the Line 2 Decommissioning project for Piedmont Natural Gas (a Duke Energy subsidiary), an existing 12-inch gas main required abandonment in place. The project, located in Pembroke, North Carolina, involved nine different crossings under…

read more…
A CJGeo worker pulling a rose through a field with a paper mill in the background during sunset.

Alabama Pipe Abandonment

The Job A paper mill in eastern Alabama required rehabilitation for an aging drainage system. Routine inspections revealed severe deterioration along the invert of a 1400-foot long corrugated metal pipe. This 42-inch diameter pipe passed directly through a dam. The…

read more…
A large white CJGeo batch plant and support truck sit at a construction site in the woods.

Sugar Creek Annular Space Grouting

The Job This Atlanta annular space grouting project is part of the City of Atlanta’s Sugar Creek project.  It involves replacing and upsizing aging sewer infrastructure southeast of downtown Atlanta.  The tunnel is 84 inch diameter, roughly 1500 linear feet, and…

read more…
CJFill-Standard cellular concrete poured around pipes and columns in a basement.

New York Lightweight Fill

The Job This New York lightweight fill project is located at Orchard Beach, in The Bronx.  CJGeo’s work is part of a reconstruction of the historic bathhouse.  The structure was originally built in the 1930s, and was due for a significant overhaul to improve safety,…

read more…
CJGeo cellular concrete batch plant onsite at a construction project with a bridge, fence, and Manhattan skyline in the background.

New York Low Density Cellular Concrete

The Job This New York low density cellular concrete project is located in Manhattan.  It is at the Manhattan end of the Gateway Program, which is bringing two new parallel rail tunnels from New Jersey to New York.  The project, administered by Amtrak, is one of the…

read more…
PNG Line 2 Decomissioning

National Mall Sinkholes

Panel 19 of the National Mall in Washington, DC, is a high-traffic, 16,000-square-foot lawn area situated directly above a WMATA metro tunnel. For over a decade, this specific section of the Mall was plagued by chronic sinkhole formation, creating significant safety hazards and maintenance challenges. Read More >

PNG Line 2 Decomissioning

National Mall Sinkholes

Panel 19 of the National Mall in Washington, DC, is a high-traffic, 16,000-square-foot lawn area situated directly above a WMATA metro tunnel. For over a decade, this specific section of the Mall was plagued by chronic sinkhole formation, creating significant safety hazards and maintenance challenges. Read More >

PNG Line 2 Decomissioning

National Mall Sinkholes

Panel 19 of the National Mall in Washington, DC, is a high-traffic, 16,000-square-foot lawn area situated directly above a WMATA metro tunnel. For over a decade, this specific section of the Mall was plagued by chronic sinkhole formation, creating significant safety hazards and maintenance challenges. Read More >

Related Materials

We manufacture our own CJGrout, and can create a wide variety of products with different specialties. That means we can always find the right product for the job. To learn more about our different lines, check them out there. Learn More >

CJGrout Logo

Polyurethane vs Cementitious Grout

Polyurethane grouting excels compared to cement-based grouting primarily due to cleanliness, speed and control. These combine to reduce overall costs compared to cement-based grouting. Polyurethane grouting can be used in place of cement-based grouts. This includes for processes such as compaction grouting, slabjacking, void filling and leak sealing. Polyurethane grouting is…

Cleaner

Polyurethane grouting is the cleanest concrete lifting and stabilization process. The injection equipment is mechanically connected to the slab or structure. Mechanical seals engage when not injecting material, no loose material is introduced to the repair area. Extruded material is easy to clean up because it cures very quickly.

Less Disruptive

Polyurethane grouting is the quietest and fastest process for stabilizing and raising settled concrete slabs. Because of the small hole size, drilling is fast and quiet. There is virtually no noise associated with the injection process itself. The equipment for polyurethane grouting is self-contained in a box truck. The trucks can park up to 400 feet away from the injection point.

Immediate Traffic

Foot traffic during work is functionally OK, and immediate resumption of vehicular traffic after work is completed can be expected. Polyurethane grouting is not affected by foot traffic during the injection process. Vehicular traffic may resume immediately after work finishes. This includes heavy loading such as trucks and industrial equipment like fork lifts, and even trains.

Fast

Polyurethane grouting crews can lift up to 12 times faster than standard slab jacking or mud jacking crews in many situations. Because of the small hole size and ability to lift larger areas per hole, polyurethane grouting is much quicker than slab jacking. Because of the equipment design, upon arriving on a job, polyurethane grouting crews are typically actively lifting slabs within 10 minutes of arrival for typical repairs.

Lightweight

Lightweight material reduces the overburden on underlying soils, reducing the chances for resettlement. Even the highest density polyurethane foams used for polyurethane grouting are significantly lighter than alternative lifting and stabilization materials. This reduces the amount of additional burden weight placed on the underlying soils. Geotechnical polyurethanes are an excellent choice for lightweight fills. Because of their exceptionally low unit weights (down to 2 PCF) and fast cure times (few minutes).

Waterproof

High density polyurethane is waterproof, so treated slabs are thoroughly undersealed. Polyurethane can also be installed in water. So, flow testing or water stop applications with active flows are not a problem. Because of the near-immediate curing, water stopping jobs are fast and easily tested on site to ensure efficacy of the repairs.

Speak With An Expert

Facing a challenge?

Contact_Us_Button