Gateway Program Lightweight Fill
The Job
This lightweight fill project is located in Manhattan, New York City. It is at the Manhattan end of the Gateway Program, which is bringing two new parallel rail tunnels from New Jersey to New York. The project, administered by Amtrak, is one of the largest, most complex construction projects in the United States.Batching and placing 200CY/hour of CJFill-Ultra Lightweight.
The Challenge
One phase of the project requires tying the new tunnels into existing rail infrastructure at Hudson Yards. This work is immediately adjacent to where the bored tunnels terminate. As part of constructing the cut-and-cover tunnels (Hudson Yards Concrete Casing - Section 3), there are large wedges as the two tunnels converge that need to be filled. The structural concrete contractor reached out to CJGeo about the feasibility of filling the wedges with CJFill-Ultra Lightweight cellular concrete instead of flowable fill. Their desire to use CJFill-Ultra Lightweight was driven by:- logistics (1 load of cement takes the place of 12 loads of flowable fill),
- reduced liquid head on forms & walls, and
- faster installation.