Flowable Fill

Low-Density Controlled Low-Strength Material (LD-CLSM)

For projects that require a fast, safe, and reliable backfill material, traditional compacted soil can present significant challenges. Traditional flowable fill, or controlled low-strength material (CLSM), is a great backfill solution that eliminates the need for mechanical compaction in trenches, behind walls, and in confined spaces. Flowable fill relies on small ready-mix truck deliveries, heavy aggregates, and is around the density of traditional soil.

CJGeo manufactures and installs Low-Density Controlled Low-Strength Material (LD-CLSM), a highly fluid, self-leveling flowable fill batched continuously on-site directly from bulk cement that weighs anywhere from 25-90 lb/cf.

LD-CLSM/Flowable Fill Applications

Pipe & Tunnel Abandonment

The use of self-leveling, low-density materials ensures minimal pumping points and a complete fill. CJGeo's low-density flowable fill can easily be pumped at a hundred cubic yards per hour up to a mile at a time. Learn More>

Annular Space Grouting

LD-CLSM flowable fill flows like water, allowing material to encase carrier pipes completely without inducing buoyancy flotation or pipe deformation. Learn More>

Underground Structure Fills

CJGeo’s rapid and continuous fills are perfect for large utility trenches, basement vaults, and abandoned underground tanks and structures.

Load-Reducing Fills

Replaces heavy soil backfill behind retaining walls or over weak and compressible soils to prevent post-construction settlement and structural deflection or failure.

Been There. Grouted That.®

PNG Line 2 Decomissioning

Power Plant Pipe Abandonment

During a Georgia power plant decommissioning, crews abandoned 6,500 feet of large cooling pipes. CJGeo generated 19,000 cubic yards of CJFill-Ultra Lightweight cellular grout onsite. Using dual plants, crews placed over 1,500 cubic yards daily, efficiently overcoming site constraints. Read More >

PNG Line 2 Decomissioning

Virginia Load Reducing Fill

For the Hampton Roads Bridge Tunnel expansion, a new facility couldn't increase loads on underlying structures. CJGeo replaced a 70lb design with 30lb/cuft CJFill-UL cellular concrete, efficiently placing 700 cubic yards daily to reduce logistics risks and meet stringent load restrictions. Read More >

PNG Line 2 Decomissioning

250000 Gallon Oil Tank Abandonment

For a New York dam upgrade, CJGeo abandoned three 300-foot outfall pipes and a box culvert. With only downstream access, crews designed a custom venting system. CJGeo easily filled the structures with 30lb CJFill-Ultra Lightweight cellular concrete in just two days. Read More >

Advantages of Low-Density Flowable Fill

PropertyCLSMLD-CLSMLD-CLSM Advantage 
Mix DesignPortland cement, water, and fine aggregatesPortland cement and water, .45–.75 ratio,  and preformed foamUniformly distributed air bubbles encased in neat cement paste eliminate material segregation
Wet Cast Density90–140 lb/cuft, similar to the density of soil25–90 lb/cuft, lighter than soilCuts dead loads up to 80%
Compressive Strength (28-Day)50–1200+ psi, excavatable and non-excavatable30–1,500+ psi, excavatable and non-excavatableHigh strength and bearing capacities without the weight penalty
Pumping Distance200’–400’Up to 1 mile, less than 20psi backpressurePumps 10x farther than CLSM and eliminates intermediate excavations
Production RateDelivered in small 10 CY ready-mix loadsUp to 200 + CY/hour continuously batched on-siteContinuous on-site batching reduces logistics bottlenecks and accelerates construction.
Flowability and Placement8"–10" slump; adding water risks aggregate segregationSelf-consolidating, 11+ slump, no compaction neededEffortlessly fills tight annuluses and complex voids

 

PropertyCLSMLD-CLSMThe LD-CLSM Advantage
Material CompositionPortland cement, water, and fine aggregatesPortland cement and water, .45–.75 ratio, and preformed foamUniformly distributed air bubbles encased in neat cement paste eliminate material segregation
Wet Cast Density90–140 lb/cuft, similar to the density of soil25–90 lb/cuft, lighter than soilCuts dead loads up to 80%
Compressive Strength (28-day)50–1200+ psi, excavatable and non-excavatable30–1,500+ psi, excavatable and non-excavatableHigh strength and bearing capacities without the weight penalty
Pumping Distance200’–400’Up to 1 mile, less than 20psi backpressurePumps 10x further than CLSM and eliminates intermediate excavations
Production RateDelivered in small 10 CY ready-mix loadsUp to 200 + CY/hour continuously batched on-siteContinuous on-site batching reduces logistics bottlenecks and accelerates construction.
Flowability and Slump8"–10" slump; adding water risks aggregate segregationSelf-consolidating, 11+ slump, no compaction neededEffortlessly fills tight annuli and complex voids