transmission slide

Transmission & Distribution

Decommission & Annular Grouting

Grouted decommissioning doesn’t have to be painful. From 42″ gas mains to 8″ electrical conduits, CJGeo provides safe, effective grouting solutions to the transmission & distribution industry’s unique challenges.

Long, difficult to access runs that need to be grout abandoned? CJGeo’s mobile cellular grout plants generate up to 200CY/hour out of a tandem axle Mack, and is fed by dry bulk cement, meaning remote locations are not a problem. Delicate conduits in a bore? Cellular concrete’s high flowability and low density facilitate long run annular space grouting, even with frequent spacers, at very low pressure.

Transmission & Distribution Projects

Speak With An Expert

Facing a challenge? Give us a shout or shoot us a text. Click the state marker for the location of the project for contact info for the appropriate rep.

Top